Concrete’s carbon footprint has always been a design consideration. In 2026, it’s becoming a procurement one. Across commercial towers, industrial sheds and the data centre boom driving so much of Australia’s current construction pipeline, project teams aren’t just asking whether your precast will meet spec – they’re asking you to prove its carbon impact with a verified Environmental Product Declaration, and they’re asking at tender stage, before a single panel is poured.
For builders and developers, that shift changes what “being competitive” looks like. A supplier who can hand over product-specific EPDs alongside their quote closes the loop on a Green Star or ISCA submission in one step. A supplier who can’t leaves you chasing documentation mid-project, or worse, re-tendering because your precast partner can’t back up the numbers your ESD consultant needs.
This article breaks down what’s driving the shift, what an EPD actually verifies, and what to look for when you’re locking in a precast supplier, including how XL Precast’s partnerships with Boral and Hymix mean the documentation is already sorted before you ask for it.
Why EPDs are suddenly everywhere
A couple of years ago, an Environmental Product Declaration was mostly a Green Star nice-to-have. Now it’s turning up as a standard line item in bid documentation across commercial towers, industrial and logistics builds, and the big one – data centres.
A few things have pushed this along at once:
Green Star Buildings v1.1: As of May 2026, every new project registering for a Green Star rating has to use the updated framework. The Green Building Council of Australia also lifted the Responsible Product Value for a product-specific EPD registered with EPD Australasia from 5 points to 7, and applied that increase retrospectively. In plain terms, a verified EPD is now worth more to a project team chasing Green Star credits than it was last year, and it’s rewarding suppliers who already had one in place.
Data centres are moving fast, and the sector knows it has an embodied carbon problem. With well over 250 operational data centres in Australia already and another 175-plus in the pipeline by 2030, industry groups like MECLA have started flagging embodied carbon – the emissions locked into structure and materials – as the next frontier now that operational energy is being tackled through grid decarbonisation and efficiency. Structure is one of the more material-intensive parts of a data centre build, which is exactly where precast sits.
Government procurement policy: The Australian Government’s Environmentally Sustainable Procurement Policy has been setting environmental expectations on construction services above certain contract values since mid-2024, with more categories added since. That flows straight down into head contractor requirements and, from there, into subcontractor and supplier tenders.
Put those together and you get what a lot of ESD consultants are now describing as EPDs moving from “nice to have” to “need to have” – not just for LEED or Green Star projects offshore, but for ordinary commercial and industrial jobs here in Australia.
What an EPD actually is (and isn’t)
An Environmental Product Declaration isn’t a green tick or a marketing badge. It’s a standardised, independently verified report – built off a life cycle assessment and compliant with standards like ISO 14025 and EN 15804 – that sets out the environmental impact of a specific product, usually per cubic metre or per tonne.
For precast concrete, that means data covering:
- Global warming potential (GWP), usually reported as kg CO2e per declared unit – this is the number most project teams zero in on
- Resource use, including raw materials and water
- Waste generated and how it’s managed
- Impacts across the product’s life cycle stages, from raw material extraction (A1) through manufacturing (A3), and in some EPDs, through to end of life
Because EPDs follow the same rules and reporting format regardless of who publishes them, an engineer or ESD consultant can genuinely compare one supplier’s precast panel against another’s, mix for mix. That’s the whole point – it takes carbon claims out of the marketing copy and puts them into a document that’s been checked by a third party.
What’s actually driving the mix-design changes
Low carbon concrete isn’t a different product so much as a smarter recipe. The bulk of concrete’s embodied carbon comes from portland cement, so lower-carbon mixes work by replacing a chunk of that cement with supplementary cementitious materials (SCMs) – typically ground granulated blast-furnace slag or fly ash, both by-products of other industrial processes rather than newly manufactured cement.
Done well, this isn’t a trade-off between sustainability and performance. Boral’s ENVISIA® range, for example, holds up to 50% cement replacement while still hitting early-age strength suitable for post-tensioned and precast applications, and actually improves drying shrinkage and creep performance compared to conventional mixes. That last point matters more to a structural engineer than any carbon figure – it’s the reason low carbon mixes have found their way into landmark builds without anyone having to compromise on engineering outcomes.
What builders and developers should actually be asking for
If EPDs are turning up in your bid documentation, here’s where the real questions sit:
Ask if the EPD is product-specific, not generic: A generic industry-average EPD tells a project team roughly what concrete looks like across the market. A product-specific EPD, tied to an actual mix design and an actual plant, is what carries real weight in a Green Star submission and gives your engineer numbers they can defend.
Check the declared unit and the scope: Make sure you’re comparing like with like – same declared unit (usually per cubic metre), same life cycle stages covered, same reference year. Two EPDs that look similar on the surface can cover different scopes.
Confirm validity dates: EPDs typically run for a set number of years before they need updating. An expired declaration won’t hold up in a submission, so it pays to check before you lock a supplier in.
Ask early, not at handover: The MECLA report on data centre delivery flagged limited supplier engagement time as one of the biggest barriers to getting good embodied carbon outcomes on fast-tracked projects. The earlier your precast supplier is in the conversation, the more options you have – including tailoring a mix design rather than settling for whatever’s on the shelf.
Where XL Precast fits in
We’ve spent close to three decades manufacturing precast walls, columns, and floors for tier 1 and tier 2 builders across Australia, and the sustainability conversation has become as much a part of a project brief as span tables and delivery schedules. Rather than treat that as a separate exercise, we’ve built it into how we source and produce.
Through our partnerships with Boral and Hymix, we supply a standard low-carbon concrete mix option across our precast range, backed by product-specific EPDs covering the mixes we use. That means when your ESD consultant or Green Star assessor asks for verified carbon data on the precast in your build, we’re not scrambling to generate it after the fact – it’s already sitting behind the numbers we quote you at tender stage.
You can see this partnership in action on our recent Bunzl Warehouse project with Boral, a case study showing how environmentally friendly precast solutions come together on the ground.
You can see this partnership in action on our recent Bunzl Warehouse project with Boral, a case study showing how environmentally friendly precast solutions come together on the ground.
For builders and developers working towards Green Star, ISCA, or NABERS Embodied Carbon targets – or simply responding to a client who’s asked for it – that’s one less document to chase down the track, and one less risk sitting in your procurement schedule.
Have a look at what we do around sustainability, or get in touch with our team early in your next project to talk through mix options and documentation before you’re locked into a design.