Labour is one of the biggest cost and programme risks on any building site, and every task that moves into the factory is one less task for the crew on site. Precast concrete construction is a form of offsite construction, where walls, columns, cores and floors are made in a controlled environment and delivered ready to install. This guide shows where precast takes labour off site, which trades it reduces and what to settle early so the savings reach your programme.
How Does Precast Concrete Reduce On-Site Labour?
Precast moves slow, labour-heavy work such as formwork, reinforcement fixing, pouring and finishing into the factory. On site, the crew lifts elements into position and connects them. Precast installs significantly faster than in-situ concrete, with fewer wet trades, less disruption on site and better programme certainty. Because elements arrive with openings, services, door and window frames and connection details already cast in, there is less cutting, drilling and modification once they land. That is why prefabricated construction suits projects where labour is tight.
How Do Precast Columns Cut Labour on Site?
Our precast columns and beams form the main frame of a building and carry load from the moment they are installed. Efficient connection systems and minimal propping mean less formwork and fewer people holding elements in place while concrete cures. The Aptus self-propping column system goes further. Patented couplers connect directly to the reinforcement bars cast into each column, so there is no propping and no grouting, and columns can be installed before the floor slab is poured. The next level of columns goes up without waiting for the slab to cure, which averages one and a half days off each floor cycle. The couplers accept up to 15mm of vertical tolerance and 3mm of lateral tolerance, and with no follow-up work after installation, there is less clutter on site and easier trade coordination.
What Labour Do Precast Walls, Cores and Floors Take Off Site?
Precast walls can be delivered fully finished. Pre-painted panels reduce onsite painting, shorten the programme and lower preliminaries such as scaffolding and site overheads, and cast-in brick panels remove bricklaying and its scaffolding from the job. Our precast panels are also made with openings, frames and services cast in, so they arrive ready to install.
When built from jump-form or slip-form in-situ concrete, lift cores are one of the most time-consuming and labour-intensive parts of a multi-storey project. Precast lift cores cut the time and wet trades involved, with openings for doors, service penetrations, and wall connections cast in during manufacture. They arrive ready to crane into position, so core construction can run in parallel with other structural work. Our precast floors work the same way, with fire collars and service openings built in to reduce on-site modifications.
How Do Delivery and Design Protect the Savings?
Labour savings only happen when elements arrive on time and fit first go. Our shop drawings and 3D modelling resolve clashes between structure, services and openings before anything is cast, and we engage early to review designs and provide value engineering. We coordinate transport and on-site installation, and our fleet uses the Langendorf self-loading trailer system to load and unload panels in under three minutes. That reduces crane time and site traffic, and panels can be stored on site where required. Because our factories in Smithfield, NSW and Yatala, QLD are undercover, production keeps moving whatever the weather is doing on site.
Talk to Us About Reducing Labour with Precast
Send us your drawings, even preliminary ones, and we will show you where precast columns, walls, cores and floors can take labour off your site. Since relaunching as XL Precast in 2010, we have delivered close to 1,000 projects across NSW, QLD, the ACT and WA, and you can see recent work on our precast projects page. Contact our team or call (02) 8724 5100 in Sydney or (07) 3803 4838 in Brisbane.
Frequently Asked Questions
Is precast concrete construction the same as offsite construction?
Precast is one form of offsite construction. Concrete elements are made in a factory, then delivered and installed on site, so less of the work happens on the building site itself.
Which trades does precast reduce on site?
Precast reduces wet trades, formwork and propping, and depending on the panel finish it can also reduce painting, scaffolding and bricklaying. Elements arrive with openings and services already cast in, so there is less cutting and drilling.
Do precast columns need propping?
Our columns use efficient connection systems that need minimal propping. The Aptus self-propping system we work with removes propping entirely, because the columns connect with mechanical couplers and are installed before the floor slab is poured. See our precast columns and beams page for more.